Equipment you cannot reach does not get serviced. Access has to be planned during installation, not after it.
Enough space around equipment
Leave room in front of and around the equipment to open it, replace parts and inspect it; the manufacturer’s manual gives the required size.
Valves and isolation points
Isolation valves and measuring points should sit where they can be reached without special tools.
Access panels
Provide panels behind ceilings and walls at joints and equipment that need inspection.
Labels and documents
Label pipe routes and equipment, and keep the drawings in line with the final condition.
Operator feedback
Asking the maintenance team before the layout is final is the best way to find access problems.